Aside from assorted outdoor construction projects and classroom upgrades, summer-time at main campus has been devoted to a great deal of interior redecoration – including a re-tiling of the cafeteria; energy-conserving lighting installation; and new, comfy, green and gold furniture sprinkled throughout the college.